Exciting News: Ruichang International Listed on Stock Exchange!

Project

Home » Project

With advanced patented technology and excellent product quality, Ruichang has successfully participated in the design and construction of a large number of projects, including flue gas cleaning system, low temperature waste heat recovery, gas desulfurization heat transfer, burners, waste heat recovery systems, catalytic equipment, sulfur recovery and incineration equipment, etc.

sulfur recovery unit case

Sulfur Recovery Unit Project In Xinjiang

Poor site conditions: extremely cold, frozen soil, difficult construction. Mobility requirements: The device needs to be easily removable. Reasonable arrangement: highly integrated arrangement under the condition of ensuring operation and … Read more
waste heat recovery unit

Desulfurization waste heat recovery project in Guangdong

Construction period: The project duration is 60 days. Achieved results: carbon saving ≥3t/h, economic income of about ≥5 million yuan/year. Construction scope: This project includes the whole EPC project such … Read more
metal heat exchanger

Waste heat recovery project in Shanxi

Application: Flue gas waste heat recovery system Capacity: gas volume of the system is 50,000N m3/h, and the temperature is 50℃ Transformation technology: “REGLASS condensation phase change condensation” technology Item … Read more
White smoke cleaning system project

White smoke cleaning system project in Henan

Application: boiler white smoke cleaning system Capacity: Daily boiler exhaust gas volume ~9800Nm3/h, smoke temperature ~55℃. Project Goal: The annual plume elimination rate is more than 90%. This is a … Read more
FGD system

Flue Gas Desulfurization Project In Jiangsu

Application: boiler flue gas treatment Capacity: gas volume of the system is 40,000 m3/h, and the temperature is 40℃. Transformation technology: “cooling water spray condensation”+”REGLASS condensation phase change condensation” technology … Read more
boiler fuel gas treatment

Boiler flue gas cleaning system project in Henan

Application: boiler flue gas treatment Capacity: gas volume of the system is 40,000 m3/h, and the temperature is 40℃ Transformation technology: “REGLASS condensation phase change condensation” technology This is a … Read more
Send Your Message Online

Get your quotation for free! Your message will be answered in 24 hours.

Please specify your project detail as much as possible.

If you have documents such as drawings to share with us, please send an email to sales@burnertec.com and add the attachment.
The basic background of the project: locations, feedstock, products, capacity, etc.
The basic background of the project: the solution/equipment you required.
When will the project start and your budgetary information.








    Email

    WhatsAPP

    Phone